home about us core business investors projects news & information contact us
Waghur Left Bank Dam Project - Construction of Earthen Dam, Masonry Dam, Guide Walls, EDA and ICPO of Waghur Dam Project at Waghur, Jalgaon Dist, Maharastra
 
Current Projects
Proposed Projects
Completed Projects
   
   
   
   
   
   
   

HNSS PHASE II -TUNNEL PACKAGE NO.59 - TURN KEY (EPC) CONTRACT

Project Name HNSS Phase-II - Tunnel Package No.59 - Turn Key (EPC) Contract
Brief Description H.N.S.S. Project – Phase –II works - Package No. HNSS Phase-II/59 Investigation, Preparation of Hydraulic Particulars, Designs & Drawings and Land Plan Schedules and Excavation of Punganur Branch Canal from Km 150.000 to Km 173.000 including construction of CM & CD works ( Including Tunnel from Km 152.000 to Km 155.000) and Distributory system to feed an ayacut of 3000 A/C Kharief ID including formation of Summer Storage tanks at chippli and Guntavaripalle villages for drinking water supply to Madanapalli Municipality in Anathapur Dist., Andhra Pradesh State.
Employer I & CAD DEPARTMENT, Govt. of Andhra Pradesh
Contract Value INR 699.10 Millions
Main Specifications of the Project
Canal Length
Canal Discharge
Tunnel Length
Tunnel Required Discharge
Tunnel Designed Discharge
Tunnel Radius
Tunnel Shape
Ayacut
: 20.00 KM
: 8.10 Cumecs
: 3.00 KM
: 8.1 Cumecs
: 8.245 Cumecs
: 2.00 M
: Horse Shoe
: 3000 Acres
Major Quantities
   
Project Images
 
back
 
  | Home | About Us | Core Business | Investors | Projects | News & Information | Contact Us |