|
HNSS PHASE II -TUNNEL PACKAGE NO.59 - TURN KEY (EPC) CONTRACT
Project Name |
HNSS Phase-II - Tunnel Package No.59 - Turn Key (EPC) Contract |
Brief Description |
H.N.S.S. Project – Phase –II works - Package No. HNSS Phase-II/59 Investigation, Preparation of Hydraulic Particulars, Designs & Drawings and Land Plan Schedules and Excavation of Punganur Branch Canal from Km 150.000 to Km 173.000 including construction of CM & CD works ( Including Tunnel from Km 152.000 to Km 155.000) and Distributory system to feed an ayacut of 3000 A/C Kharief ID including formation of Summer Storage tanks at chippli and Guntavaripalle villages for drinking water supply to Madanapalli Municipality in Anathapur Dist., Andhra Pradesh State. |
Employer |
I & CAD DEPARTMENT, Govt. of Andhra Pradesh |
Contract Value |
INR 699.10 Millions |
Main Specifications of the Project |
Canal Length
Canal Discharge
Tunnel Length
Tunnel Required Discharge
Tunnel Designed Discharge
Tunnel Radius
Tunnel Shape
Ayacut |
: 20.00 KM
: 8.10 Cumecs
: 3.00 KM
: 8.1 Cumecs
: 8.245 Cumecs
: 2.00 M
: Horse Shoe
: 3000 Acres |
|
Major Quantities |
|
Project Images |
|
back |
|
|